a green background with a black stripe in the middle

Sitemap

FAQs

Q: Should precision converted components be dual-sourced?

Dual sourcing reduces supply risk but doubles qualification and change control effort, and two converting processes can produce measurably different parts. It is most often justified for high-volume or supply-critical components. Where dual sourcing is used, both suppliers should be qualified against the same baseline and specification. Advantage Converting can also support dual-source strategies through its two manufacturing facilities, providing an additional option for production continuity and supply-risk planning.

Q: What is a bridge build?

A bridge build, or last-time buy, is inventory purchased from the outgoing supplier to cover production while the new supplier is qualified. It should be sized to cover tooling, material lead times, qualification, internal approvals, and a contingency for a failed first article — not just the expected best-case timeline.

Q: Does changing a converting supplier require FDA notification?

It depends on the device and the change. Medical device manufacturers evaluate supplier changes under their own quality system — ISO 13485:2016 and, in the United States, FDA’s Quality Management System Regulation (21 CFR Part 820). Some supplier changes can be managed internally through change control and supplier qualification; others may affect regulatory filings. That determination belongs to the device manufacturer’s regulatory team.

Scroll to Top