FAQs
A key component of the manufacturing process, custom converting entails materials selection, die cutting, laminating, slitting, and a variety of other services for various industries and applications. Understand the basics of what we do at Advantage Converting and how we do it better.
Filter By:
Q: How does prototype-to-production transition affect multilayer yield?
Multilayer constructions are more sensitive to the prototype-to-production gap than single-layer components because tolerance stack-up only becomes a yield driver at volume, material lot variation affects multiple interfaces simultaneously, and process changes between prototype and production tooling (manual to automated laminating, for example) affect registration accuracy across the entire stack. Planning the transition before prototype tooling is committed is how these risks are managed rather than discovered.
Q: How early in the design process should a converting partner be involved?
Before adhesive selection is finalized and before production tooling is committed — ideally during the design phase when material stack and feature placement decisions are still open. The highest-value DFM input occurs when changes are still low-cost. After tooling is built, the cost of addressing convertibility issues increases significantly.
Q: How long does it take to transfer a die-cut component to a new converting supplier?
It depends on tooling, material lead times, validation scope, and the customer’s own change approval. A simple single-layer part with reusable tooling can transfer in weeks. A multilayer component for a regulated application that needs new tooling and process validation typically takes months. Building a transfer plan with the receiving supplier before committing to a cutover date is the most reliable way to set the timeline.
Q: How often should a qualified converting supplier be re-audited?
Audit frequency depends on the risk level of the application, the supplier’s quality history, and the requirements of the device manufacturer’s own quality system. Common intervals for regulated programs are annual surveillance audits with triennial full requalification. Trigger-based requalification — initiated by significant process changes, quality escapes, or audit findings — should supplement interval-based auditing.
Q: How should die-cut dimensions on compressible materials be measured?
With a method that does not compress the part — typically an optical comparator or vision system — from datums agreed between the customer and the converter. Contact measurement such as calipers can compress foams and soft materials and read undersize.
Q: How tight can precision die-cutting tolerances be?
Typical ranges run from about ±0.001″ with matched-metal (Class A) tooling, to about ±0.005″–±0.010″ for rotary die cutting, to about ±0.005″–±0.025″ for steel rule flatbed dies, on stable materials with simple geometry. Compressible foams and soft rubbers typically hold wider tolerances. The achievable tolerance for a specific part depends on its material, geometry, construction, and production conditions. Tighter tolerances than these common reference ranges are possible for specific applications, subject to engineering review and process verification.
Q: Is ISO 13485 certification sufficient to qualify a converting supplier for a regulated application?
It is a necessary threshold condition — not a sufficient qualification. ISO 13485 certification confirms that the supplier operates a documented quality management system that has been audited by a third party. It does not confirm that the system is operationally integrated into converting processes, that processes are validated at the required level, or that capability data exists for your specific component requirements. Qualification requires verification beyond the certificate.
Q: Is ISO 13485:2016 required for all medical device component suppliers?
Not universally — but it is usually the expected requirement for suppliers producing components used in regulated medical devices. Device manufacturers operating under FDA or international regulatory frameworks typically require their critical component suppliers hold ISO 13485:2016 certifications as a baseline qualification condition. Whether it is formally required depends on the device classification, the regulatory jurisdiction, and the manufacturer’s supplier qualification requirements.
Q: Is rotary or flatbed die cutting more precise?
Rotary die cutting can support tight tolerances in high-volume, in-line multilayer and kiss-cut work, while steel rule flatbed tooling is often selected for thicker materials, larger parts, development work, or lower volumes. Matched-metal Class A tooling can support the tightest reference ranges shown in this article, typically on thinner, dimensionally stable materials. The best method still depends on the specific material, geometry, construction, volume, and tolerance requirement.
Q: Should precision converted components be dual-sourced?
Dual sourcing reduces supply risk but doubles qualification and change control effort, and two converting processes can produce measurably different parts. It is most often justified for high-volume or supply-critical components. Where dual sourcing is used, both suppliers should be qualified against the same baseline and specification. Advantage Converting can also support dual-source strategies through its two manufacturing facilities, providing an additional option for production continuity and supply-risk planning.
Q: What does a 3M Preferred Converter do?
A 3M Preferred Converter is part of a select group of converters recognized within 3M’s converter network for their converting capabilities and experience working with 3M materials. Preferred Converters help customers translate 3M material technologies into application-specific components and material constructions.
Advantage Converting applies its precision converting and engineering capabilities to transform 3M tapes, adhesives, films, foams and other specialty materials through processes including die cutting, laminating, slitting, cleanroom converting, prototyping and process development based on application and production requirements.
Q: What is a bridge build?
A bridge build, or last-time buy, is inventory purchased from the outgoing supplier to cover production while the new supplier is qualified. It should be sized to cover tooling, material lead times, qualification, internal approvals, and a contingency for a failed first article — not just the expected best-case timeline.